LOCATION: Boulder, CO SANVEO SCOPE: MEP Layout. Laid out points for “Mechanical/ Electrical* (Over 56,000)
LOCATION: San Francisco, CA PROJECT COST: $1 Billion PROJECT SCOPE: 555 bed, 15 stories SANVEO SCOPE: Model creation for stud framing, structural embeds and HSS supports. Clash coordination support...
LOCATION: Redwood City, CA GC: Swinerton Builders PROJECT SCOPE: OSHPD-3 facility SANVEO SCOPE: Model creation, coordination and shop drawings for all backing.
LOCATION: Brighton, CO SANVEO SCOPE: Electrical Underground Layout. 3000 points.
LOCATION: 501 J Street, Sacramento SANVEO SCOPE: 3D modeling of all electrical systems, clash coordination with other MEP trades, and shop drawings CLIENT: Redwood Electric Group SIZE: 195,000 sq...
LOCATION: Dublin, CA SANVEO SCOPE: 3D modeling of all electrical systems, clash coordination with other MEP trades, and shop drawings CLIENT: Redwood Electric Group SIZE: 220,000 sq ft
LOCATION: Palo Alto, CA PROJECT HIGHLIGHTS: 521,00 sq-ft, 149 room, 3 acres outdoor areas and gardens GC: DPR CLIENT: Redwood Electric SANVEO SCOPE: 3D modeling of all electrical systems,...
LOCATION: Mission Bay, San Francisco SANVEO SCOPE: 3D modeling of all electrical systems, clash coordination with other MEP trades, and shop drawings CLIENT: Redwood Electric Group SIZE: 200,000 sq...
LOCATION: San Francisco, CA PROJECT HIGHLIGHTS: 878,000 sq-ft, 289 beds, multi-building integrated complex GC: DPR CLIENT: Redwood Electric SANVEO SCOPE: 3D modeling of all electrical systems, Clash coordination with...
LOCATION: Oakland, CA PROJECT HIGHLIGHTS: 12 stories, 349 beds, 650,000 sq-ft GC: McCarthy Buildings Company CLIENT: Redwood Electric SANVEO SCOPE: 3D modeling of all electrical systems, Clash coordination with...