Hub for 13 different transportation systems in Downtown San Francisco. Cost: $2 billion Location: San Francisco, CA Architect: Pelli Clarke Pelli General Contractor: Obayashi-Webcor Scope: 3D Modeling of all...
The Alaskan Way Viaduct, an elevated section of State Route 99 in Seattle, was built in the 1950s, and decades of daily wear and tear have taken their toll...
LOCATION: San Francisco, CA SANVEO SCOPE: Created point layout (office work) from Revit/ Auto. Laid out points for “Electrical” (2500)
LOCATION: San Diego, CA PROJECT HIGHLIGHTS: The Mid Coast Transit Corridor is a high-priority trolley extension project that will connect with the existing regional rail system. COST: $1.7 Billion...
Metro Crenshaw/LAX Line will travel 8.5 miles offering an alternative transportation option to congested roadways. The line is an 8.5-mile extension consisting of at grade, below grade, and aerial...
Completing its construction in 2019, the newly constructed Concourse is designed to accommodate 23 million passengers. It will also replace the five existing concourses with two linear concourses; North...
LEED ® Gold certification Cost: $2.4 billion (Terminal 1 Redevelopment) Location: San Francisco, CA Architect: Gensler and Woods Bagot Architects General Contractor: Hensel Phelps (Terminal 1 Center), Austin – Webcor Builders JV (Boarding Area...
SFO’s Consolidated Administration Campus will provide for the development of a staff campus by consolidating administrative and technical departments into a new stand-alone administration campus with easy access to...
LOCATION: San Francisco, CA PROJECT HIGHLIGHTS: Terminal 3 East is designed to enhance the customer experience featuring new space for dinning, retail, and a consolidated security checkpoint. COST: $252...
SFO – Air Traffic Control Tower Standing 221 feet tall, the new tower features an inviting, flared design clads in curved metal paneling. Distinctive torch-shaped form is compatible with...